Anticipated Projects

Hirst Avenue Upgrade – Alberni Highway to McMillan Street
(Scope discovery)
Expected completion TBD
The Hirst Avenue upgrade from Alberni Highway to McMillan Street, about 220 metres, will be upgraded to a modified downtown road standard road. Due to right-of-way constraints at Alberni Highway and numerous existing driveway access points along the corridor, the current downtown road standard may not be practicable. New water and sanitary sewer will be installed along with new service connection piping to the property line. The existing storm drainage system will be assessed and upgraded as applicable and will include catch basins and service connection piping. Both the sanitary sewer and storm drainage systems will have inspection chambers installed at the property line for more efficient future maintenance access and operations. The project will also provide new underground infrastructure for BC Hydro, Shaw Cable and TELUS, concluding beatification already undertaken on McMillan and Alberni Highway. Consistent with capital projects completed or underway, the City will also examine the feasibility of using LED streetlight technology for this upgrade.
Copyright © City of Parksville
All Rights Reserved | Site by Trinex Internet Solutions
Legal Disclaimer/Privacy Statement