Arrowsmith Dam
The Arrowsmith dam is located about 35 kilometres south of Parksville. Commissioned in 2000, the dam was built as the Arrowsmith Water Service joint venture. The dam, with a storage volume of 9 million cubic metres, is used to supplement the Englishman River flow by releasing during the summer and fall to meet the domestic water demands and enhance fish habitat. This is outlined in the Conditional Water Licence which governs the release of water from the reservoir. Depending on climactic conditions and seasonal requirements, conditions of the licence are adjusted in consultation with federal and provincial fishery authorities. At certain periods, the flow requirements may be reduced to ensure sufficient water is retained in the reservoir for release during September and October. Water is withdrawn from the Englishman River through the intake facility operated by the City of Parksville
Arrowsmith Dam Reservoir Weekly Report
*Updates will be provided from June 1 to October 31
-
September 14
September 7
August 31
August 24
August 17
August 10
August 3
July 26
July 19
July 12
July 5
June 28
June 21
June 14
June 4
June 1
Conditional Water Licence and 2025 Provisional Operation Rule
Conditional Water Licence
2026 Enabling Order (provided to the City on May 29, 2026)